LQ Lab Series 4.1: I.V. Direct Integration Overview for LQ

LQ Lab Series 4.1: I.V. Direct Integration Overview for LQ

Purpose

Use this article as a pre-deployment checklist for an I.V. Direct connection between an LQ and another Clear‑Com system. Verify product-specific behavior, supported topologies, port/transport values, licensing, and software/firmware requirements in the applicable Clear‑Com documentation.

Table of Contents

What Is I.V. Direct?

I.V. Direct is Clear‑Com’s IP-based method for carrying intercom audio between supported systems. Supported peers, required software/firmware, licensing, and configuration steps depend on the endpoint—such as an LQ, Eclipse HX with an IVC-32 or E‑IPA card, or Arcadia—so confirm the product documentation before deployment.

The LQ connects to a supported host over an IP network. Deployment may use LAN, WAN, or internet paths depending on product capabilities, firmware, network design, and security policy. Configure both sides and confirm network reachability, endpoint address, applicable port and transport, authentication credentials, and channel/key assignment per product documentation.

  • EHX for Eclipse Matrix

  • Arcadia CCM for Arcadia

  • LQ CCM for LQ

Core System Components

Component

Function / Role

Component

Function / Role

Eclipse HX Matrix Frame

Hosts the IPA card and manages matrix routing, labels, panels, and crosspoints.

IVC-32 / E-IPA Card

Provides IP channels for I.V. Direct connections, Agent‑IC panels, and other IP-based matrix workflows.

Arcadia Central Station

Hosts an Arcadia-side I.V. Direct resource that can connect to an LQ and be assigned to Arcadia channels or roles.

LQ Series Unit

Connects local audio resources—2‑wire, 4‑wire, SIP, or virtual clients—into the I.V. Direct IP path.

EHX Software

Configures Eclipse Matrix card properties, IP settings, credentials, port functions, and matrix-side assignments.

Arcadia CCM

Configures Arcadia I.V. Direct resources, credentials, channel assignments, and connection status.

LQ CCM

Configures LQ I.V. Direct remote settings, port settings, assignments, and status checks.

Network and Infrastructure Prerequisites

Requirement

What To Check

Requirement

What To Check

IP addressing

Confirm LQ and the target system have valid IP addresses. Use a static IP or DHCP reservation.

https://clear-com.atlassian.net/wiki/spaces/~712020a4fe31623aff404ab423327a53dbb343/pages/edit-v2/4901044288?draftShareId=5511526b-1c41-4a53-b0c7-b38a1afe26d0

Matrix: How to setup and configure E-IPA Static IP (ADMIN/IVC).

Subnet / VLAN

Ensure the LQ and target system can communicate. They can be on different subnets or VLANs if routers connect them and firewalls allow I.V. Direct control and audio traffic. Verify reachability and that required ports are open.

Matrix: What settings do I use when I have IP panels on both local / remote networks using NAT routing?

Gateway / routing

Provide a gateway and routing path when the connection crosses subnets, VLANs, WAN, or internet links.

Ports / firewall

Allow required control and audio ports through the firewall.

QoS / bandwidth

For routed or WAN links, confirm sufficient bandwidth and stable latency for real‑time audio. If the connection spans VLANs, sites, or firewalls, coordinate with the network team before troubleshooting product settings.

Credentials

Ensure the user ID and password match on both sides.

Port Configuration

Do not rely on fixed port numbers. I.V. Direct port assignments and transport requirements vary by product, firmware version, topology, and configuration. Verify active port and firewall requirements in the applicable Clear‑Com product documentation and endpoint configuration before deployment.

I.V. Direct endpoint

Default Port

Port / transport

I.V. Direct endpoint

Default Port

Port / transport

Eclipse HX with E-IPA / IVC-32

6001

Confirm the I.V. Direct / LQ Direct port in EHX.

Arcadia

6002

Confirm the I.V. Direct port in Arcadia configuration.

Ref: Minimal Clear-Com Port Requirements

Integration Workflow Summary

Phase

What Happens

Main Check

Phase

What Happens

Main Check

Phase 1 - Network Configuration

Confirm IP address, subnet mask, gateway, VLAN, and reachable path.

LQ and the target system can reach each other.

Phase 2 - I.V Host System Setup

Configure the I.V. Direct / LQ Direct port or resource on the Eclipse Matrix or Arcadia.

The target-side resource exists with correct credentials.

Phase 3 - LQ CCM Setup

Create the I.V. Direct remote system and port settings in LQ CCM.

IP address or hostname, port, user ID, and password match the I.V. host system.

Phase 4 - Connection Verification

Confirm connection status on both sides.

A green or healthy status appears.

Screenshot 2026-08-25 at 14.56.02.png
LQ
Screenshot 2026-08-25 at 14.57.18.png
E-IPA

Phase 5 - Assignment and Audio Verification

Assign the I.V. Direct port to the correct channel, key, role, or route.

https://clear-com.atlassian.net/wiki/pages/resumedraft.action?draftId=4909269003&draftShareId=7e57857f-7505-4127-b716-07605cf0b8dd&atlOrigin=eyJpIjoiOTk0NzA0MDNiMDFkNDAxNDk5MzcwNTFmODUzMjJkMjIiLCJwIjoiYyJ9

Talk and listen paths match the intended workflow.

Green connection status only confirms the I.V. Direct port is online. You must still assign the channel, key, or route before the audio path becomes operational.

 

 

CAN'T FIND YOUR ANSWER? CLICK HERE TO CONTACT SUPPORT


This solution was provided by Clear-Com via a question submitted to us by customers like you. If you wish to share with us a new solution or update an old one, please follow this link..


The information on this page is owned by Clear-Com and constitutes Clear-Com’s confidential and proprietary information, may be used solely for purposes related to the furtherance of Clear-Com’ business and shall not be disclosed, distributed, copied or disseminated without Clear-Com’s prior written consent. Click Here for Clear-Com's privacy statement.