LQ Lab Training Series
The LQ Training Lab Series is designed as a foundational introduction to the LQ system. It covers the core setup, linking, interface integration, and connectivity workflows that every LQ user needs to know before moving on to advanced configuration or system design.
Publication status: Modules 1–4.3 are live in this release. More articles are coming soon.
LQ Learning Path
Use this learning path to understand how the LQ topics build on each other.
Category | Modules | Learning Outcomes |
|---|---|---|
Foundation and Core Setup | Modules 1-2 | Identify the correct LQ model, configure IP settings, access CCM, link LQs, and assign channels. |
Local and System Interface Integration | Modules 3-4 | Connect and configure 2-wire, 4-wire, 2-wire to 4-wire, Matrix, and Arcadia integration. |
Network, Client, Cloud, and Advanced Integration | Modules 5-8 | Configure SIP / Agent-IC workflows, remote WAN linking, Gen-IC cloud integration, and radio integration. |
Module 1 — Foundation
Prepare the LQ hardware and network connection, then complete the first access checks required before configuration.
Module 2 — Core Setup / Linking
Configure the LQ-to-LQ relationship, assign channels, establish audio routing, and verify the first linked audio path.
Module 3 — Analog Interface Integration
Configure local analog interfaces and verify signal paths using practical connection, port setting, level, and Auto-Null checks.
Module 4 — I.V. Direct Integration
Configure I.V. Direct integration between LQ and supported Clear-Com systems such as Eclipse Matrix and Arcadia. This module covers the two-sided configuration required in LQ CCM and the host system.
Module 5 — SIP / Agent-IC Integration
Complete SIP registration and supported client connection workflows, including account setup, profile checks, and signalling validation.
Module 6 — Remote / WAN Integration
Prepare routed-network deployments using reachable addressing, NAT, port forwarding, and basic path verification.
Articles in Module 6 are being prepared and will be added progressively.
Module 7 — Cloud Integration / Gen-IC
Configure LQ registration, prepare the Gen-IC workspace, link LQ to the correct instance, and verify baseline cloud connectivity.
Articles in Module 7 are being prepared and will be added progressively.
Module 8 — Radio Integration
Configure the radio audio interface and GPIO controls, document the required pinout, and verify PTT operation. This module is placed last because radio integration depends on 4-wire audio, GPIO behavior, cable wiring, and product-specific verification.
Articles in Module 8 are being prepared and will be added progressively.