/
Partyline: Encore dummy termination

Partyline: Encore dummy termination

When connecting two stations together to form a stand alone PL intercom system with no Clear-Com main station or power supply unit . Then a dummy termination is required (no wired intercom involved) A dummy load needs to be connected to each intercom chnl  to prevent the audio from oscillating in the beltpack user's headsets. 
This is especially true if connecting 2x wireless basestations together via their intercom PL connection but there is no externally powered mainstation linking them together
Items needed to build a dummy load in a 3-pin XLR connector: (1) 3-pin XLR connector (1) 220 ohm resistor (1) 10 uF 50 Vdc non-polar capacitor ( a polarized 10 uf 50Vdc capacitor can be used, orient the minus lead to pin 1 of XLR) (1) 4k7 ohm resistor.



See attached 

  File Modified

PDF File Encore Dummy termination.pdf Encore Dummy termination.pdf

Apr 06, 2019 by Administrator

Related content

CAN'T FIND YOUR ANSWER? CLICK HERE TO CONTACT SUPPORT


This solution was provided by Clear-Com via a question submitted to us by customers like you. If you wish to share with us a new solution or update an old one, please follow this link..


The information on this page is owned by Clear-Com and constitutes Clear-Com’s confidential and proprietary information, may be used solely for purposes related to the furtherance of Clear-Com’ business and shall not be disclosed, distributed, copied or disseminated without Clear-Com’s prior written consent. Click Here for Clear-Com's privacy statement.